Process flowsheet of heat recovery at reverse cooling of auticlaves
UDC 621.577
Timofeev B. D., Volkov V. V.
Abstract
A new process flowsheet of heat recovery at reverse cooling of autoclaves, heat being utilized for auxiliaries at "Bykhov cannery_drying enterprise has been developed. Additional cost of auxiliary equipment 358.5 mln. BR roubles being taken into account, annual saving of operational costs according to the flow sheet proposed amounts to 96.26 mln BR roubles in comparison with the scheme adopted by the project. The pay-back period of the proposed flowsheet is not more than 3.72 years.
Keywords: heat pump, autoclave, reused water, heat load, power saving technology, technical and economic assessment, waste heat.
Process flowsheet of heat recovery at reverse cooling of auticlaves
Abstract
A new process flowsheet of heat recovery at reverse cooling of autoclaves, heat being utilized for auxiliaries at "Bykhov cannery_drying enterprise has been developed. Additional cost of auxiliary equipment 358.5 mln. BR roubles being taken into account, annual saving of operational costs according to the flow sheet proposed amounts to 96.26 mln BR roubles in comparison with the scheme adopted by the project. The pay-back period of the proposed flowsheet is not more than 3.72 years.
Keywords: heat pump, autoclave, reused water, heat load, power saving technology, technical and economic assessment, waste heat.